Chinese New Year shuts China's factories from 6 February. Lock your prices now and your stock ships before the lights go out. Send 5 SKUs

Back to home
For manufacturers

Send us your spec. Quotes from verified factories in days.

A drawing, a datasheet, a material grade or a physical sample. Parts, raw materials or finished components. One part or your full parts list. Up to 5 items: €100, off our fee when you order.

What happens next

  1. 1

    Within 24 h we reply and tell you if it's a fit. Files follow after our reply, under NDA if you want one.

  2. 2

    In a few working days you get factory quotes: price per quantity, MOQ, lead time, tooling if any. €100 for up to 5 items, off our fee when you order.

  3. 3

    Like the numbers? We agree samples or a first lot against your spec before anything goes to series.

Your prices, suppliers and drawings stay between us. The enquiry to factories goes out without your name. Want an NDA before you send anything? Just ask.

  • Parts to drawing, materials to grade, components to datasheet

    Machined, cast, stamped, moulded, extruded, granulates, textiles, electrical insulation.

  • Anonymised enquiry first.

    Your full package goes out only after the shortlisted factory signs an NNN in Chinese.

  • Samples or a first lot checked against your spec, with material certificates, before series production.

  • Contract and payments in your name.

    Factory communication runs through us.

Send your spec

What to send

  1. 1

    What it is: one part, material or product, or your full parts list

  2. 2

    The spec: drawing (PDF, STEP, DXF), datasheet, material grade or standard, or photos of a sample

  3. 3

    Annual quantity and batch size

  4. 4

    Certificates you need (3.1, RoHS, REACH, others)

  5. 5

    What you pay now

What it is, the spec (drawing, datasheet or material grade), annual quantity and what you pay now. Files follow by email after our reply, under NDA if you want one.

We reply within 24 hours. Factory prices in a few working days. We use your details only to reply to your inquiry. Privacy Policy

Questions people actually ask us.

Who sees my drawings and specs?

In the first round, a neutralised version, and only with your OK: no company name, no customer, no original part number, nothing that points to you. The shortlisted factory signs an NNN (non-use, non-disclosure, non-circumvention) in Chinese, under Chinese law, before it gets your full package. Want an NDA with us before you send anything? Just ask.

How do I know it matches my spec?

Samples or a first lot before series, shipped with the factory's measurement or test report against your spec and the material certificate. You check them your way. Series starts on your written approval. Every order gets a pre-shipment inspection per ISO 2859-1, AQL 2.5 major / 4.0 minor, unless your spec says tighter.

Who owns the tooling, and what does it cost?

You do. Moulds, dies and fixtures are paid by you, listed as a separate line in the quote, and named as your property in the factory contract and in our agreement. Tooling cost is on the first quote, not a surprise later.

What are the lead times?

Quotes in a few working days from your spec. Samples or first articles in 1 to 6 weeks, longer if a mould has to be built. Series from one week to 3 months, plus 4 to 6 weeks by sea. Concrete dates per item before you commit.